How Long Does It Take To Build A Custom Swimming Pool?

Swimming Pool Construction Timeline

Wondering: How long does it take to build a pool from start to finish? Building a swimming pool typically takes eight to 12 weeks from start to finish. This timeframe raises the question: How long does it take to build a swimming pool? The answer can vary depending on a variety of factors such as the type of pool, permit acquisition, and weather conditions. In this blog, we’ll break down each stage of the pool construction process and what can influence the duration. Interested in getting the pool you’ve always desired? Schedule a free estimate with KustomScapes & Pools to get started on the process!

Average Timeline for Building a Swimming Pool

The average timeline for building a swimming pool is estimated to be between eight to 12 weeks. However, this schedule can vary depending on several factors such as the type of pool, required permits, and the time of year. Pool installation can take as little as two weeks to over two months, depending on various circumstances. Factors like backyard conditions, weather, and contractor availability also play a significant role in determining the project's overall duration.

The pool building process involves several stages, each contributing to the overall timeline. These stages include initial consultation and design, permit acquisition, excavation and site preparation, pool shell installation, plumbing and electrical installation, swimming pool construction, pool deck and landscaping, and finally, filling the pool and adding the final touches. Each stage has its own set of activities and timelines, which collectively determine the total time required for a pool builder to complete building a pool. Understanding the pool building timeline helps set realistic expectations and plan accordingly. Let’s delve into each stage in detail to get a clearer picture of what to expect and how long each phase typically takes to build a pool.

Initial Consultation and Pool Design – One to Four Weeks

The initial consultation and pool design phase typically takes one to four weeks. During the initial consultation, the pool contractor will discuss your vision, preferences, and requirements for the new pool. This includes determining the pool’s size, shape, and additional features such as a pool deck, lighting, and landscaping. The initial layout planning stage usually takes about one to two days. Once the design is agreed upon, the next step is to obtain proper permits and identify utility locations. Scheduling contractors and landscapers plays a significant role in the timeline, especially during busy seasons. The pool design process is an exciting phase where you can visualize your dream pool and make decisions that will bring your perfect swimming pool design to life. The average timeline for building a swimming pool is estimated to be between eight to 12 weeks. However, this schedule can vary depending on several factors such as the type of pool, required permits, and the time of year. Pool installation can take as little as two weeks to over two months, depending on various circumstances. Factors like backyard conditions, weather, and contractor availability also play a significant role in determining the project's overall duration.

Permit Acquisition – Two to Six Weeks

Acquiring the necessary permits for building a pool can take anywhere from two to six weeks. The permit process is essential to ensure that the pool construction complies with local regulations and safety standards. The duration of this phase can vary widely depending on local approval procedures and requirements, ranging from one week to up to six weeks. Obtaining the proper permits is a critical step in the pool building process. It is advisable to start this process early to avoid delays. Collaborating closely with your pool contractor can simplify the permitting process and help secure approvals more efficiently.

Excavation and Site Preparation – One to Two Weeks

Excavation and site preparation typically take one to two weeks for a swimming pool. Site preparation before excavation usually takes a couple of hours. This phase involves marking the pool layout, clearing the area, and ensuring that the excavation site is ready for excavation. Heavy equipment such as excavators, dump trucks, and cranes are used to dig the pool hole. However, certain factors can extend this phase. If the soil is unstable, building up with compacted stone layers is required, which is time-consuming. Additionally, encountering bedrock or shale during excavation necessitates the use of a hydraulic hammer to break it up, further extending the timeline. Proper site preparation is critical for ensuring a stable foundation for the pool.

Pool Shell Installation

How long does it take to install an inground pool? The installation of the pool shell is a significant milestone in the pool building process. The duration of this phase varies based on the type of pool being installed. Fiberglass pools are the quickest option, often completed in just one day. Vinyl liner pools take longer, with installation times ranging from one to four weeks. Concrete pools require the most time, typically taking four to eight weeks due to the curing process needed for the concrete.

Each type of pool shell has its own installation process and timeline. Understanding these differences can help you choose the option that best suits your needs and timeline. Let’s explore how long each type of pool shell may take to install in more detail.

Fiberglass Pools – One Day

Fiberglass pools are pre-manufactured and designed for quick installation, often completed in just one day. The installation process involves transporting the fiberglass pool shell to the site and placing it into the excavated hole. This quick installation makes fiberglass pools an attractive choice for those looking to enjoy their pool sooner. However, factors such as site conditions could extend the installation to one to two days or a few hours. Despite this, fiberglass pools remain the quickest option available, offering a hassle-free and efficient installation process.

Vinyl Liner Pools – One to Four Weeks

Vinyl liner pool installations usually take one to four weeks, with the duration varying significantly based on design complexity. The process involves assembling the pool walls, installing the vinyl liner, and securing it in place. The timeline for constructing vinyl liner pools may extend if the pool design is complex, taking up to two weeks after excavation. While vinyl liner pools offer a balance between cost and customization, the installation timeline for vinyl pools can vary. Proper planning and coordination with your pool contractor can help manage this phase effectively.

Concrete Pools – Four to Eight Weeks

Building a concrete pool typically spans four to eight weeks, heavily influenced by concrete curing times. The process involves constructing the pool shell using gunite or shotcrete, which then needs to cure properly to ensure durability. Outdoor conditions, such as temperature, can affect the curing time of concrete pools. Despite the longer timeline, custom concrete pools offer unparalleled customization and durability, making them a popular choice for many homeowners with residential pools.

Plumbing and Electrical Installation – One to Three Days

Plumbing and electrical installation for a swimming pool typically takes between one to three days. This phase involves installing the necessary plumbing lines and electrical systems to ensure the pool operates correctly. The process of routing plumbing and electrical lines generally takes one to three days. The time required for plumbing and electrical work can vary based on the complexity of the pool setup. Ensuring proper installation of these systems, including electrical wiring, is crucial for the pool’s functionality and safety. Coordination with skilled professionals can help streamline this phase.

Pool Deck and Landscaping

Constructing the pool deck and adding landscaping features are essential steps in completing the pool area. The process for pouring concrete and finishing the pool deck typically takes two to three days. Pool landscaping and patio construction typically takes between one to four weeks to complete. Adding landscaping and custom features enhances the aesthetic appeal and functionality of the pool area. Factors influencing the time for adding custom features include complexity and the number of features. Let’s break down the timeline for patio construction and landscaping in more detail.

Patio Construction – One to Three Weeks

The process of constructing a patio around the pool typically spans from one to three weeks. This phase involves laying the foundation, pouring concrete, and finishing the surface. The duration can vary based on the size and design of the patio. Proper patio construction enhances the usability and aesthetics of the pool area.

Filling the Pool and Final Touches – Two to Four Days

The process of constructing a patio around the pool typically spans from one to three weeks. This phase involves laying the foundation, pouring concrete, and finishing the surface. The duration can vary based on the size and design of the patio. Proper patio construction enhances the usability and aesthetics of the pool area.

Factors Affecting Pool Construction Timelines

Understanding these factors and planning accordingly can help minimize delays and ensure a smoother pool construction experience. Let’s explore some of these factors in more detail.

Weather Conditions

Weather conditions play a significant role in the timeline for building a swimming pool. Inclement weather can cause delays in excavation and construction activities, extending the overall timeline. Planning your pool construction around seasonal weather patterns can help minimize delays. Delays caused by bad weather can extend the overall timeline for pool construction. By considering weather conditions and planning accordingly, you can reduce the impact of weather-related delays on your pool project.

Supply Chain Issues

Delays in receiving materials or equipment can significantly impact the construction schedule of a swimming pool. Supply chain issues can stem from various factors, including shortages and logistical challenges that affect the availability of materials used for construction. These supply chain challenges can lead to extended timelines and increased costs, disrupting the overall flow of construction. Strategies to minimize delays include ordering materials early and working with reliable suppliers.

Unforeseen Ground Conditions

If underground utilities are discovered during excavation, it may lead to significant delays as additional planning and work are required. Unforeseen ground conditions such as bedrock, unstable soils, or underground utilities can significantly affect in-ground pool construction. Addressing unforeseen ground conditions can extend the overall project timeline and complicate the construction process. Planning for potential unforeseen conditions can help mitigate delays, but they often still result in additional time and effort in the pool-building process.

When to Start Your Pool Project

The pool building season typically begins in spring. It is ideal to break ground for pool construction as early as possible during the building season after the ground thaws. Starting early can help avoid the busy season and ensure the timely completion of your pool project. To prioritize your pool construction project, start the design process and book your builder as soon as possible. Contact KustomScapes & Pools for your free estimate and to get started.

Let’s Work Together

Building a swimming pool is a journey with several important steps, each shaping the final outcome. From the initial design meeting to digging the first hole, installing the shell, and adding the finishing touches, knowing what to expect can make all the difference. At KustomScapes, we stay actively involved every step of the way, with job site visits happening weekly, sometimes even daily, to ensure everything is running smoothly. We treat every client like family, because that’s how we’d want to be treated.

With thoughtful planning, a little patience for the weather, and an eye on potential delays, your dream of a personal backyard oasis is well within reach. So why wait? Start your pool project today and take the first dive into a lifetime of memories. Let today be the day you take the first step toward bringing your dream pool to life with KustomScapes & Pools!

Frequently Asked Questions

How long does it take to build a swimming pool?

Building a swimming pool typically takes about eight to 12 weeks, but keep in mind that factors like the type of pool and weather can influence this timeline. It's best to plan ahead!

What is involved in the initial consultation and design phase?

The initial consultation and design phase usually takes about one to two weeks and includes planning the pool layout, securing necessary permits, and coordinating with contractors. It's all about setting a solid foundation for your project!

What factors can delay the construction of a swimming pool?

Bad weather, supply chain problems, or unexpected ground conditions can cause delays in building a swimming pool.

Let's build something
great together.

Return to top ↑

Easton Contact Info

Phone: 443-786-1464
Email: Kelsey@kustomscapesandpools.com
Address: 9017 Centreville Road Easton, MD 21601
Find us at:

Easton Hours

Monday - Friday
Saturday
Sunday
8 a.m. - 5 p.m.
9 a.m. - 1 p.m.
Closed

Edgewater Contact Info & Hours

Phone: 410-956-9464 Email: info@kustomscapesandpools.com
Address: 9 Lee Airpark Dr. b.200 Edgewater, MD 21037
Monday - Friday: 9 a.m. - 5 p.m.
Saturday: 9 a.m. - 4 p.m.
Sunday: Closed
Pentair
Nicolock
Visa
Mastercard
Discover
American Express
Read our terms & conditions.
© 2025 iFrog Marketing Solutions

Pool Shell Installation